HUBUNGAN LAMA KERJA DAN KEBISINGAN DENGAN STRES KERJA PADA PEKERJA UNIT PRODUKSI PAVING BLOCK DI UD. RIZKI ASSILA ULFA LUBUK PAKAM KABUPATEN DELI SERDANG

Authors

  • Anggi Isnani Parinduri Institut Kesehatan Medistra Lubuk Pakam
  • Luci Riani Br Ginting Institut Kesehatan Medistra Lubuk Pakam
  • Irmayani Irmayani Institut Kesehatan Medistra Lubuk Pakam
  • Risa Elvira Prabaja Institut Kesehatan Medistra Lubuk Pakam

DOI:

https://doi.org/10.35451/jkg.v3i1.518

Keywords:

work duration, noise, work stress

Abstract

In line with current industrial growth which requires labor as the dominant element that manages raw materials, machinery, equipment and other processes in the workplace. Each workplace contains a variety of potential hazards that can affect the health of the workforce or can cause occupational diseases that are work stress. The purpose of this study is to describe the relationship between work duration and noise and work stress in paving block production unit workers at UD. Rizki Assila Ulfa Lubuk Pakam Deli Serdang Regency 2020. This research uses analytical descriptive method using cross sectional design. The population in this study were 30 paving block production unit workers with the sampling technique using Total Sampling. Data analysis was performed univariately and bivariately using the Chi-Square statistical test with α = 0.05. The results of the analysis show that there is a relationship between work duration and noise with work stress on paving block production unit workers at UD. Rizki Assila Ulfa Lubuk Pakam Deli Serdang Regency in 2020, namely the length of work p value (0.005) <α (0.05), and noise p value (0.031) < α (0.05). Based on the results of research it is recommended to workers that workers condemn personal protection by using Personal Protective Equipment (PPE) such as ear plugs that can protect the ears from noise caused by machines, so as to reduce exposure to noise that can interfere with health.

Downloads

Download data is not yet available.

Downloads

Published

2020-10-31

How to Cite

Parinduri, A. I., Br Ginting, L. R., Irmayani, I., & Prabaja, R. E. (2020). HUBUNGAN LAMA KERJA DAN KEBISINGAN DENGAN STRES KERJA PADA PEKERJA UNIT PRODUKSI PAVING BLOCK DI UD. RIZKI ASSILA ULFA LUBUK PAKAM KABUPATEN DELI SERDANG. JURNAL KESMAS DAN GIZI (JKG), 3(1), 84–90. https://doi.org/10.35451/jkg.v3i1.518